The Transformer Loading Analysis tool analyzes a network to determine the maximum and minimum load conditions that occur during a specified time period.
The run begins with user specifying setup options, via the Transformer Analysis Options dialog.
Time Point Analysis Options setting defines the time points used for analysis.
Analyze ALL Time Points - runs the analysis for all time points found in database.
Analyze
Time Points as Selected - runs loading analysis using only the
time points currently selected for analysis, i.e. via
Analysis/Select
Times for Analysis setting.
Note: If no
time points have been selected, then the Time Points List dialog
opens for user to select time points.
Analysis Type:
Entire System - runs Transformer Analysis for the entire system.
Selected Circuit - runs Transformer Analysis for a circuit, which is selected during execution.
Advanced Analysis Options:
Analyze ALL Monitor Locations - select to include all defined monitor locations.
Use Temperature Adjusted Ratings - select to run analysis using the temperature adjusted ratings.
Analyze ALL Switchable Devices - select to include all switchable devices in the analysis.
Report Available Amps with Analysis - select to have analysis generate and display the Time Loading Analysis - Available Amps Capacity Report.
Report Options:
View Report Files - opens (i.e. via Notepad) the Transformer Load Management (TLM) report generated from the analysis.
Use Comma Separated Format - generates TLM report in CSV format.